top of page

News List

2024年

8月

弊社が支援するカンボジアにドローン測量と画像解析技術を普及するJICA事業が第7回JAPANコンストラクション国際賞 中堅・中小建設企業部門において国土交通大臣表彰を受賞

JAPANコンストラクション国際賞について


2024

March 14th

The drone surveying and image analysis project in Cambodia that we support was introduced on the local Department of Public Works and Transport's Facebook page. Department of Public Works and Transport Siem Reap Facebook Department of Public Works and Transport Battambang Facebook

2023

December 26

In the 2023 JICA "Small and Medium Enterprises/SDGs Business Support Project," one dissemination, demonstration, and commercialization project (Small and Medium Enterprise Support Type) and one business demonstration project in which JDI will support/participate have been selected. The planned implementation period is from 2024 to 2026.

2023

May 7

Papua New Guinea Special Economic Zone Summit 2023 will be held. JDI announced the SEZ Strategic Development Masterplan. It was reported on local television and in local articles. PNG Business News May 15, 2023 article "PNG'S SEZ SUMMIT HIGHLIGHTS IMPORTANCE OF GLOBAL BEST PRACTICES TO DRIVE INVESTMENTS"

2023

February 27th

Our activities in Papua New Guinea were featured in a local newspaper.
Loop February 24, 2023 article "JDI experts wrap up visits"

2023

February 20

Two dissemination, demonstration, and commercialization projects (SME support type) in which JDI participates have been selected for JICA's 2022 SME/SDGs Business Support Project.

The planned implementation period is from 2023 to 2025.

2022

December

We were awarded the contract for the "Philippines Public Asset Resilience Improvement Project Basic Plan Development Study (Evaluation Analysis)" and carried out the project from November to December 2022.

2022

December 7th

The project has been commissioned by the Ministry of International Trade and Investment (Government of Papua New Guinea) to be carried out under the title "The Development of the Papua New Guinea Special Economic Zones Strategic Development Masterplan 2023-2033," and will be implemented for approximately six months from December 2022.

2022

October

Participate as an external participant in the "Palau Small Electric Vehicle, Solar Power Storage and Charging System, and Himeshima Model Global Warming Countermeasure Project Study" Implementation period: October 2022 - July 2023

2022

October

We will participate as an external resource in the "Feasibility Study for the Introduction of Organic Waste Volume Reduction Equipment for Highly Efficient Volume Reduction and Recycling of Sewage Sludge in Vietnam." Implementation period: October 2022 to November 2023

2022

August

We will participate in the "Information Collection and Confirmation Survey on Promoting Problem Solving in the Social Infrastructure Sector through Effective Implementation of SMEs and SDG Business (First Period)" Implementation Period: September 2022 - April 2023

2021

October 19

JDI has been selected for JICA's first "SME/SDGs Business Support Project" for fiscal 2021 (supporting SMEs' overseas expansion).

2021

October 8th

The "Feasibility Study on Wave Energy Generation Utilizing Digital Transformation in Mauritius" project (proposal company: Mitsui O.S.K. Lines, Ltd.), in which JDI participates, has been selected by the Ministry of Economy, Trade and Industry for the FY2021 "Subsidy Program for Study on the Feasibility of Business for the Overseas Expansion of High-Quality Energy Infrastructure (Study to Promote the Overseas Expansion of Japanese Infrastructure)."

bottom of page